Quartier Paul-Gossen-Straße

Erlangen, Germany

Code: CS36

Project before renovation
© Passive House Institute
Project after renovation
© Passive House Institute
Project during renovation
© Passive House Institute
Construction details
© Passive House Institute
Construction details
© Passive House Institute
Construction details
© Passive House Institute
Construction details
© Passive House Institute

Résumé

Renovation of seven 1950s apartment blocks with prefabricated, highly insulated façade elements, heat pumps and heat-recovery ventilation.

Original situation

The building is typical of multi-storey residential buildings constructed in Germany during the 1950s and 1960s. Its supporting structure consists of 30 cm masonry walls and reinforced concrete floors. The building has a gable roof with unheated attic space and a solid basement. The staircases are slightly recessed.

The original windows have since been replaced with plastic windows and, in some cases, wooden windows with double-glazed thermal insulation. The façade and windows were last renovated in 1990, when an 8 cm external thermal insulation composite system (ETICS) was also installed. The top-floor ceiling and basement ceiling were insulated as part of the retrofit.

In its original state, the building was heated by a central gas heating system. Ventilation was provided through manually opened windows. There is no active cooling system. Instead, all windows are fitted with roller shutters to help prevent overheating.

Renovation approach

Renovation approach document

Modernisation proposal

The building will be retrofitted with prefabricated timber façade elements incorporating cellulose fibre insulation. The windows are already integrated into the façade elements at the factory. Additional work will be carried out on site by a specialist contractor. This includes connecting the new windows to the existing reveals, adding a second layer of ETICS insulation to the existing system in the balcony areas, replacing the balcony doors, insulating the basement and the underside of the basement ceiling, and installing additional insulation at the perimeter.

An additional residential storey is planned for the buildings within the next two years, including appropriate roof or top-floor insulation and photovoltaic (PV) systems. However, this extension has not yet been confirmed. As a result, the attic will not be upgraded as part of the current renovation. Instead, the renovation is designed to achieve appropriate component performance levels within the existing building geometry.

The prefabricated façade elements will be installed within two days of delivery. So-called backpackers will be fitted between the façade elements. These external service modules are installed on the façade near the bathrooms and accommodate the new heating and domestic hot water (DHW) pipes, as well as a ventilation system with heat recovery for each residential unit.

Heating and hot water are supplied by externally installed heat pumps, each serving four residential units on either side of the staircase in each building. Heat is distributed to the apartments via the external backpacker modules, with connections made through the bathrooms.

Efficiency improvement

Renovation measures will cut the demand for heating by more than 68 %.

Predicted energy savings:

Savings in space heating demand: 68 [kWh/(m²a)]

Savings Primary Energy Demand: 102 [kWh/(m²a)]

Savings PER Demand: 243 [kWh/(m²a)]

Savings of Final energy demand gas: 141 [kWh/(m²a)]

Savings of Final energy demand electricity: 0 [kWh/(m²a)] Household appliances not updated

Additional final energy demand electricity: 28 [kWh/(m²a)] Heat pumps for Heating and DHW

PHPP verification sheet before retrofit

PHPP verification sheet after retrofit

PHPP verification sheet before retrofit

TFA existing treated floor area (usable floor space)

1071.0 m2

Space heating Heating demand

99.0 kWh/(m2a)

Heating load

48.0  W/m2

Space cooling Cooling & dehum. demand

– kWh/(m2a)

Cooling load

– W/m2

Frequency of overheating (> 25 °C)

0.0 %

Frequency of excessively high humidity (> 12 g/kg)

0.0 %

Airtightness Pressurization test result n50

3.0 /h

Non-renewable Primary Energy (PE) PE demand

193.0 kWh/(m2a)

Primary Energy Renewable (PER) PER demand

265.0 kWh/(m2a)

Generation of renewable energy (in relation to projected building footprint area)

0.0 kWh/(m2a)

EnerPHit classic

no

PHPP verification sheet after retrofit

TFA existing treated floor area (usable floor space)

1071.0 m2

Space heating Heating demand

31.0 kWh/(m2a)

Heating load

18.0  W/m2

Space cooling Cooling & dehum. demand

– kWh/(m2a)

Cooling load

– W/m2

Frequency of overheating (> 25 °C)

1.0 %

Frequency of excessively high humidity (> 12 g/kg)

0.0 %

Airtightness Pressurization test result n50

1.0 /h

Non-renewable Primary Energy (PE) PE demand

91.0 kWh/(m2a)

Primary Energy Renewable (PER) PER demand

67.0 kWh/(m2a)

Generation of renewable energy (in relation to projected building footprint area)

192.0 kWh/(m2a)

EnerPHit classic

no

Video

Click to view via Youtube (Google)

Key facts

Building typology

Multi family dwelling

Existing treated floor area (usable floor space)

1 071 m2

Building owner

GEWOBAU Erlangen

Consulting outphit partner

Passive House Institute

Project status

Finished