Original situation

1970 built NONRES Building in the outskirts of Coulanges sur Yonne. EHPAD stands for medical retirement homes for elderly people.

Renovation approach

In order to speed up the renovation, prefabricated elements are being applied as often as possible. The renovated part will meet the EnerPHit Standard whereas the new build will reach the Passive House Classic level.

Renovation approach document

Modernisation proposal

“Semi prefabricated” global retrofit. The renovated part is a 2-storey building (on the left of the mansion), some facades will be renovated using prefabricated modules. A new building is added to the compound (on the right of the mansion).

Efficiency improvement

The renovated part is a retrofit with Passive House components to meet the “EnerPHit” standard. The new building is going to be a “Passive House Classic”.

PHPP verification sheet before retrofit

TFA existing treated floor area (usable floor space)

3300.0 m2

Space heating Heating demand

165.0 kWh/(m2a)

Heating load

–  W/m2

Space cooling Cooling & dehum. demand

– kWh/(m2a)

Cooling load

– W/m2

Frequency of overheating (> 25 °C)

– %

Frequency of excessively high humidity (> 12 g/kg)

– %

Airtightness Pressurization test result n50

– /h

Non-renewable Primary Energy (PE) PE demand

– kWh/(m2a)

Primary Energy Renewable (PER) PER demand

– kWh/(m2a)

Generation of renewable energy (in relation to projected building footprint area)

– kWh/(m2a)

EnerPHit classic

no

PHPP verification sheet after retrofit

TFA existing treated floor area (usable floor space)

3300.0 m2

Space heating Heating demand

22.0 kWh/(m2a)

Heating load

17.0  W/m2

Space cooling Cooling & dehum. demand

2.0 kWh/(m2a)

Cooling load

5.0 W/m2

Frequency of overheating (> 25 °C)

– %

Frequency of excessively high humidity (> 12 g/kg)

3.0 %

Airtightness Pressurization test result n50

1.0 /h

Non-renewable Primary Energy (PE) PE demand

141.0 kWh/(m2a)

Primary Energy Renewable (PER) PER demand

89.0 kWh/(m2a)

Generation of renewable energy (in relation to projected building footprint area)

– kWh/(m2a)

EnerPHit classic

no

Key facts

Existing treated floor area (usable floor space)

3 300 m2

Building owner

EHPAD Ste Clotilde

Consulting outphit partner

PROPASSIF

Project status

Planning phase

Overall budget

9 470 000 €