Coulanges sur Yonne, France
Code: CS11
1970 built NONRES Building in the outskirts of Coulanges sur Yonne. EHPAD stands for medical retirement homes for elderly people.
In order to speed up the renovation, prefabricated elements are being applied as often as possible. The renovated part will meet the EnerPHit Standard whereas the new build will reach the Passive House Classic level.
“Semi prefabricated” global retrofit. The renovated part is a 2-storey building (on the left of the mansion), some facades will be renovated using prefabricated modules. A new building is added to the compound (on the right of the mansion).
The renovated part is a retrofit with Passive House components to meet the “EnerPHit” standard. The new building is going to be a “Passive House Classic”.
TFA | existing treated floor area (usable floor space) |
3300.0 m2 |
---|---|---|
Space heating | Heating demand |
165.0 kWh/(m2a) |
Heating load |
– W/m2 |
|
Space cooling | Cooling & dehum. demand |
– kWh/(m2a) |
Cooling load |
– W/m2 |
|
Frequency of overheating (> 25 °C) |
– % |
|
Frequency of excessively high humidity (> 12 g/kg) |
– % |
|
Airtightness | Pressurization test result n50 |
– /h |
Non-renewable Primary Energy (PE) | PE demand |
– kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
– kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
TFA | existing treated floor area (usable floor space) |
3300.0 m2 |
---|---|---|
Space heating | Heating demand |
22.0 kWh/(m2a) |
Heating load |
17.0 W/m2 |
|
Space cooling | Cooling & dehum. demand |
2.0 kWh/(m2a) |
Cooling load |
5.0 W/m2 |
|
Frequency of overheating (> 25 °C) |
– % |
|
Frequency of excessively high humidity (> 12 g/kg) |
3.0 % |
|
Airtightness | Pressurization test result n50 |
1.0 /h |
Non-renewable Primary Energy (PE) | PE demand |
141.0 kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
89.0 kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
3 300 m2
EHPAD Ste Clotilde
PROPASSIF
Planning phase
9 470 000 €
Farid Abachi
AMO AZIMUT
E-Mail: farid.abachi@azimut-amo.fr