Lons le Saunier, France
Code: CS9
1960s concrete non-residential building on the outskirts of Lons le Saunier. The building is used by AJENA, “Association Jurassienne d’Energies reNouvelAbles", as a centre for training on retrofitting, so a well renovated building would be a big plus, making obsolete its old fuel heating system and giving more sense to renewable energy on top of the building.
Monitoring post-renovation is now underway. The project's certification is now completed and will be awarded on September 23, 2023, during the building's inaugual ceremony.
Internal Insulation on the “blind” north wall. On the south wall: mounted on site “wooden boxes” to hold insulation . Comfort ventilation with high performance heat recovery. Air tightness and reduction of thermal bridges.
The improvement that an EnerPHit renovated building can offer is huge in this cold part of Jura near Geneva, reducing heating demand by a factor of 10.
TFA | existing treated floor area (usable floor space) |
285.0 m2 |
---|---|---|
Space heating | Heating demand |
342.0 kWh/(m2a) |
Heating load |
113.0 W/m2 |
|
Space cooling | Cooling & dehum. demand |
– kWh/(m2a) |
Cooling load |
– W/m2 |
|
Frequency of overheating (> 25 °C) |
9.0 % |
|
Frequency of excessively high humidity (> 12 g/kg) |
0.0 % |
|
Airtightness | Pressurization test result n50 |
1.0 /h |
Non-renewable Primary Energy (PE) | PE demand |
154.0 kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
641.0 kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
TFA | existing treated floor area (usable floor space) |
285.0 m2 |
---|---|---|
Space heating | Heating demand |
14.0 kWh/(m2a) |
Heating load |
12.0 W/m2 |
|
Space cooling | Cooling & dehum. demand |
– kWh/(m2a) |
Cooling load |
– W/m2 |
|
Frequency of overheating (> 25 °C) |
11.0 % |
|
Frequency of excessively high humidity (> 12 g/kg) |
0.0 % |
|
Airtightness | Pressurization test result n50 |
1.0 /h |
Non-renewable Primary Energy (PE) | PE demand |
101.0 kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
65.0 kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
Office | administration building
285 m2
AJENA
PROPASSIF
Certified
550 000 €
Etienne Vekemans
CEO
PROPASSIF
Telefon: 0145081335
E-Mail: e.vekemans@propassif.fr