Metz, France
Code: CS38
1970's non-residential concrete building on the campus in Metz. The building is used as a training centre for the activities of IUT GMP, Lorraine University. A fast, high quality renovation process is the goal of this project and would save 350 MWh fossil gas per year.
External insulation with airtightness treatment on a structure with a complex shape to receive and fix an insulation. Reduction and treatment of thermal bridges in the façade by use of prefabricated elements.
Prefabricated global retrofit to EnerPHit level thanks to a prefabricated wall system produced by the company "Hunsinger". Triple-glaze windows and a comfort ventilation system are already inserted into the wall.
The improvement of an EnerPHit renovated building has an enormous effect in this cold part of the Jura near Geneva: it shows a plus 6x reduction on the heating demand!
TFA | existing treated floor area (usable floor space) |
2730.0 m2 |
---|---|---|
Space heating | Heating demand |
128.3 kWh/(m2a) |
Heating load |
55.0 W/m2 |
|
Space cooling | Cooling & dehum. demand |
– kWh/(m2a) |
Cooling load |
– W/m2 |
|
Frequency of overheating (> 25 °C) |
2.0 % |
|
Frequency of excessively high humidity (> 12 g/kg) |
0.0 % |
|
Airtightness | Pressurization test result n50 |
3.0 /h |
Non-renewable Primary Energy (PE) | PE demand |
144.0 kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
319.0 kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
TFA | existing treated floor area (usable floor space) |
2730.0 m2 |
---|---|---|
Space heating | Heating demand |
23.5 kWh/(m2a) |
Heating load |
13.0 W/m2 |
|
Space cooling | Cooling & dehum. demand |
– kWh/(m2a) |
Cooling load |
– W/m2 |
|
Frequency of overheating (> 25 °C) |
1.0 % |
|
Frequency of excessively high humidity (> 12 g/kg) |
0.0 % |
|
Airtightness | Pressurization test result n50 |
1.0 /h |
Non-renewable Primary Energy (PE) | PE demand |
62.0 kWh/(m2a) |
Primary Energy Renewable (PER) | PER demand |
70.0 kWh/(m2a) |
Generation of renewable energy (in relation to projected building footprint area) |
– kWh/(m2a) |
|
EnerPHit classic |
no |
School | campus | university
2730 m2
Université de Lorraine
ProPassif
Planning phase
2000000 €
Etienne Vekemans
CEO
PROPASSIF
Phone: 0145081335
E-Mail: e.vekemans@propassif.fr